Investments
Since 2013, the AIP team has led investments of more than EUR 2.7 billion in 11 infrastructure assets across North-western Europe and the US
Click the markers on the map to read about the investments made in that area.
Viiatti
Viiatti Viiatti represents AIP’s investment into the 149MW Matkussaari onshore wind project located in West Finland. The project is 100% owned by Valorem, an experienced French independent power producer who, through its subsidiary, will also provide asset management services during both the construction and operational phases. AIP will provide EUR 135m project financing to the…
Navarra
Navarra Navarra represents AIP’s first investment into the Spanish renewable energy market. Navarra is a portfolio of four onshore wind projects located in Northern Spain. Once complete, the projects will have a total nameplate capacity of 139MW via 24 x GE 5.8 wind turbines. The project is 100% owned by Enerfín Sociedad de Energía, S.L.U…
Agility Trains East
Agility Trains East Agility Trains East (“ATE”) is a rolling stock fleet of 65 Hitachi Class 800/801 Intercity Express trains running on the East Coast Main Line in the UK. The fleet, which is compromised of both electric and bi-modal trains, is fully delivered and in operation. AIP investors hold a 30% equity stake in…
Porter
Porter Porter is a portfolio of three onshore wind farms located in Lithuania with a total capacity of 186 MW. The wind farms are being developed and built by European Energy, who will provide Construction Management services during the construction phase as well as Technical and Commercial management services in the operational phase. General Electric…
Elias
Elias Elias represents a portfolio of four onshore wind projects located in South-West Finland. Once complete, the projects will have 23 x Vestas wind turbines with a total nameplate capacity of 131.8MW. The projects are 100% owned, through holding companies, by Ilmatar Energy Oy (“Ilmatar”), who is an experienced local independent power producer. A subsidiary…
Cross London Trains
Cross London Trains Cross London Trains (“XLT”) is a rolling stock fleet of 115 Siemens Desiro City Class 700 trains running on the ThamesLink passenger rail franchise across London in the UK. The fleet consists of all electric commuter trains. The fleet was delivered from 2016-2018 and has been in full operation since then. AIP…
Vestprosess
Vestprosess Vestprosess DA is a natural gas liquids (NGLs) processing facility in Norway located at the Mongstad processing plant. AIP acquired an 8% participating interest in Vestprosess DA from A/S Norske Shell, through its subsidiary North Sea Infrastructure in October 2019. In addition, North Sea Infrastructure entered into a purchase agreement with Total E&P Norge…
TDC
TDC TDC was established in 1882 and is Denmark’s largest telecommunications provider with more than 3 million customers and around 7,000 employees. In May 2018, TDC was taken-private by a consortium consisting of Macquarie Group, PKA, PFA and ATP with a focus on strengthening the Danish digitalization through large scale investments into fibre and 5G…
BlaFa
BlaFa Blakliden/Fäbodberget onshore windfarm (BlaFa) is a 353MW onshore wind farm located in Sweden. PKA has partnered with the Swedish utility Vattenfall and turbine supplier Vestas to build the wind farm which is expected to cover the annual electricity consumption for approximately 220,000 Swedish households. AIP investors will own 30%, Vattenfall 30% and Vestas 40%,…
Nyhamna
Nyhamna The Nyhamna gas processing plant is one of Northern Europe’s largest gas processing facilities located in North-western Norway. It became operational in 2007 and processes gas from the Ormen Lange and Aasta Hansteen fields. More fields are expected to be connected in the future through the Polarled pipeline that connects Aasta Hansteen with Nyhamna.…
Walney Extension
Walney Extension Walney Extension is a 659MW offshore wind farm located in the East Irish Sea in the UK. The wind farm consists of 87 positions split into 40 MHI Vestas 8MW and 47 Siemens-Gamesa 7MW turbines. The asset has been operational since mid-2018 and has been providing renewable electricity to over 590,000 UK households…
Tees Renewable Energy Plant
Tees Renewable Energy Plant Tees Renewable Energy Plant is a 299 MW biomass power plant located in Northern England. The asset is under construction and is expected to be completed by 2023. When completed, the power plant should generate enough electricity to cover the annual electricity consumption of approx. 600.000 British households. AIP investor PKA…
Burbo Bank Extension
Burbo Bank Extension Burbo Bank Extension is a 258MW offshore wind farm located 7km off the coast of Liverpool in the UK. The wind farm consists of 32 MHI Vestas 8MW. The asset became fully operational in 2017 and it supplies renewable electricity to approximately 230,000 UK households. AIP investor PKA held a 25% equity…
Gode Wind 2
Gode Wind 2 Gode Wind 2 is a 252MW offshore wind farm located in the German North Sea, approximately 45 km from the German coastline. Gode Wind 2 consists of 42 wind turbines, each with 6MW capacity from Siemens Wind Power, including a gearless solution and rotors with a wingspan of 154 meters in diameter.…
Gemini
Gemini Gemini is a 600MW offshore wind farm located in the Dutch part of the North Sea, 85 km north off the coast of Groningen. Gemini is supplying renewable electricity to some 630,000 Dutch households annual and consists of 150 Siemens wind turbines with a capacity of 4.0 MW each, making it one of the…
Butendiek
Butendiek Butendiek is a 288MW offshore wind farm located in the North Sea around the German-Danish border, approximately 32 km off the island of Syl. It consists of 80 Siemens 3.6 MW wind turbines. Every year until decommissioning, the wind farm will supply green and renewable electricity to cover the annual consumption of some 300,000…
Anholt
Anholt Anholt is one of the largest offshore wind farms in Denmark, located between Jutland and the island of Anholt. It has a capacity of 400 MW coming from the 111 Siemens 3.6 MW wind turbines. Anholt has the capacity to supply green and renewable electricity corresponding to the annual consumption of approximately 480,000 Danish…
Lorax
Lorax Located in Southern California, Lorax is a 463 MW solar facility coupled with 186 MW / 744 MWh Battery Energy Storage System (BESS) consisting of: Victory Pass (VP I), a 200 MW solar facility and 50 MW/ 200 MWh BESS and; Arica, a 263 MW solar facility and 136 MW/ 544 MWh BESS BESS…
Zion Battery Energy Storage Systems (BESS)
Zion Battery Energy Storage Systems (BESS) Zion BESS is two 4-hour battery energy storage systems in California, with a total combined capacity of 160 MW / 640 MWh. The energy storage systems is co-located with the operational solar PV facilities Garland and Tranquillity in Kern and Fresno County. The batteries are charged directly by the…
Tranquillity
Tranquillity Tranquillity is a photovoltaic solar facility situated in Fresno County, California. The facility has a capacity of 258MWdc and consists of more than 800,000 solar panels. The facility became operational in 2016 and provides renewable electricity to 50,000 households every year. AIP investors hold a 49% equity stake with Southern Power owning the remaining…
Prospero I
Prospero I Prospero is a solar generation asset situated in Andrews County, Texas. The facility has a capacity of 379MWdc and achived COD in 2020. It will provide renewable electricity to almost 180,000 households every year and consists of more than 3m solar panels. AIP investors hold a 50% equity stake in a joint…
Little Bear
Little Bear Little Bear comprises 4 solar generation assets situated in Fresno County, California totaling 211MWdc. The facilities started operations in December 2020 and will provide renewable electricity to more than 100,000 households every year. Jointly, the facilities consist of almost 500,000 solar panels. AIP investors hold a 50% equity stake in a joint venture…
Garland
Garland Garland is a photovoltaic solar facility situated in Kern County, California. The facility has a capacity of 272MWdc and consists of more than 800,000 solar panels. The facility became operational in 2016 and provides renewable electricity to 50,000 households every year. AIP investors hold a 49% equity stake with Southern Power owning the remaining…
Escalade
Escalade Escalade is a 336MW onshore windfarm located in Knox County, Texas. The wind farm has been in operations since mid-2022. The asset consists of 65 turbines split into 20 Vestas V150 and 45 Vestas V162 turbines. It is estimated to provide renewable electricity to 275,000 households every year. AIP investors jointly hold a 35%…
El Campo
El Campo El Campo is a 243MW onshore wind farm located in Knox County, Texas. The park started construction in July 2019, and all 67 Vestas turbines have been operating since the third quarter of 2020. Construction will be managed by Longroad Energy and performed by the experienced M.A. Mortenson. The wind park will be…